STEAM CI Games Secures 26.8 Million Euro Loan to Fund Lords of the Fallen II GAMES The Talos Principle 2 price jumps to $39.99, three years after launch GAMES Final Fantasy XIV: Evercold delayed to February 2027, pre-orders start November 4 GEFORCE RTX Steam Hardware Survey reveals average gamer now uses RTX 5070 with 32 GB RAM PC HARDWARE HP Series 3 Pro 334wp G2 debuts with 90W USB-C and 34-inch 120Hz display for $329 NINTENDO SWITCH Black Shark Rift Split Controller launches for around $57 in China GAMES Honor Win 2 Delta Force Edition packs 10,100mAh battery and dual-fan cooling for mobile gaming INTEL Unofficial God of War PC port update boosts average FPS from 51 to 57 AMD Shagg88’s COGBox removes 30 fps cap and adds 5K support to Gears of War 2, 3 and Judgment GAMES Turn 10 Studios fully merges into Playground Games, Forza Motorsport creator Dan Greenawalt retires GEFORCE RTX RTX 5080 prices hit $1,980 as Nvidia removes card from official store GAMES Dune: Awakening gets 35 hours of free ‘Blood and Ice’ expansion on December 1 GAMES Star Wars Jedi 3 enters advanced development stage, official announcement expected soon CONSOLES Xbox US market share shrinks as Asha Sharma’s strategic initiatives fail to reverse sales decline

Goldhofer PST/SL-ES 285 Rotor Blade Transporter Features Adjustable Track

Lena Fischer 2 min read

Goldhofer unveils the PST/SL- ES 285 rotor blade transporter, featuring adjustable track width via rotating axles and an optional electric power pack for wind farm logistics.

Goldhofer PST/SL-ES (285)
PC HARDWARE

Goldhofer has introduced the PST/SL-ES (285), a specialized rotor blade transporter designed to handle the increasing size of modern wind turbine components. This vehicle addresses a critical logistical challenge for wind farm construction by offering adjustable track width, which allows operators to stabilize heavy loads during transport. The adjustment mechanism rotates the axles outward to widen the track by 300 mm, providing the lateral stability needed for safe movement of massive blades.

Specialized heavy haul vehicle features rotating axles and dual power options

The transporter is built with a modular power system that supports both diesel and electric operation. Goldhofer presented an optional electric power pack alongside the standard diesel unit to accommodate sites with strict noise or emission regulations. The standard diesel power pack typically lasts for one shift, covering six to eight hours of operation before refueling is required.

Specifications

  • Track Width Adjustment: Widens by 300 mm (11.8 inches) via rotating axles
  • Power Options: Diesel power pack or optional electric power pack
  • Diesel Runtime: Typically lasts for one shift (six to eight hours)
  • Configuration: Compatible with +1 configuration (two vehicles side by side)

Engineering details highlight the vehicle's adaptability for complex transport scenarios. The axle rotation system is the primary feature for stability, but the company is still testing a "spirit level" display feature and has not yet decided if it will be included in the final production model. The electric power pack runtime remains undisclosed, though the company confirmed it will be shorter than the diesel version's six to eight hour capacity.

The PST/SL-ES (285) supports a "+1 configuration" that allows two vehicles to travel side by side while carrying heavy loads. This capability enables more efficient transport operations for large-scale wind energy projects. The vehicle was unveiled at Goldhofer's Innovation Days event, showcasing the company's focus on specialized heavy-haul engineering solutions.

Source: NotebookCheck